Install base flashing step 7.
Westman steel roofing installation guide.
Install roof trim flashing and westman steel underlayment step 3.
When installing roofing panels take care to avoid walking on the butt of the panels.
Gable trim after applied step 6.
Installation guide important notes.
Trim the bottom of the valley to the correct angle and allow 5 8 to bend around the eave starter.
Clean sheets of any debris before installation.
Material checklist step 2.
5 outside closure install along upper edge of panels about 2 below the edge.
4 panel wood screw space according to recommended fastening pattern and local codes.
Drive through the outside closure and the ribs of the panel beneath.
Use a circular saw with a fine tooth blade at a high speed but a low advance rate to cut 3 4 sheets at a time.
For curved cutting use a jigsaw or metal cutting shears.
Screw length is to be long enough to penetrate the decking.
Add the metal panels.
Roof sheets step 4.
Other wall trims and flashings step 8.
Installation guide handling.
Fasten eave starter with 10 x 1 long galvanized zip screws 12 o c.
Begin installation on side away from wind rain direction.
Wall sheeting step 9.
Underlayment is to be installed over the eave starter.
Store sheets in a cool and dry place out of direct sunlight.
During cutting secure sheets to ensure clean cuts.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Accurately measure the roof and create a roof plan for estimating and ordering roof panels and accessories ensure all required roof penetrations are in place before beginning pluming vents exhaust attic venting etc remove any dirt or debris from.
From basic sheet steel cladding to snaplok roofing panels and on to more sophisticated steel shingles with stone coating and even steel spanish tiles.
Notch hem of top valley and overlap valley 4 and put 2 rows of sealant between overlap.
Stack short sheets on top of longer ones.
Installation consists of the following steps.
Install ridge cap step 5.
Fasten valley in place with clips and fasteners on the outer edge of the valley every 16 on center.
Achieving rooftop architectural expressions is easy with westman roofing products.
Install eave starter at all eaves.
Simply choose the installation guides appropriate for your project.
To prevent solar heat buildup avoid covering the stack of sheets with a dark tarp or other heat absorbing material.
All products offer advanced benefits such as long service lives easy installation and little maintenance over traditional roofing materials.